Huoi Quang hydropower Project

·      Investor: Hydropower Project Management Board 1
·      Date of completion: June 2007
·      Technical descriptrions:
- Bridge item Km 23 + 519;
+ Super construction: 2 spans by prestressed reinforcement concrete with I-beam cross section, L=33m
+ Sub construction: Pile foundation with diamete D1000; support by reinforced concrete
 - Road system to hydroelectric power plant from Km27 to Km29 + 877. Pavement’s width Bm = 5.5 m; poundation’s width of Bn = 7.5 m. Pavement’s construction: thick ballast is 18cm and penmac ballast is 5.5 kg/m2.
 
 
 
 
 
 
 
 
 
 
 
Related Articles