Bridge length L = 490m, bridge gauge B=13.5m; road bed 12m, tonnage 80 tons.Constructed road surface on the foundation of CPDD, Basement=9.0m; Face = 6.0m. Bridge section span diagram (5×33)+(55+90+55)+(5×33)m, total length of bridge to end of abutment: Ltc= 542.88m. Pre-constructed reinforced concrete bridge constructed by balanced cantilever technology, reinforced concrete pier abutment on bored pile foundation system D=1.0-1.5m
Tuyen Quang
ADB Provincial Road Upgrading Project Management Board – Tuyen Quang Department of Transport