Resiliencecreates values

Dai Phuoc Bridge

+2 image
details

Scale:

Prestressed reinforced concrete girder L=33m, cantilever span 70+110+70m, bored pile foundation D≥1.0m, CPDD foundation, concrete pavement

Location:

Dong Nai

Investor:

Construction Development Investment Corporation (DIC)