Construction of secondary road, Vtk = 70km/h, grade I. Construction main urban road, asphalt concrete pavement, soft soil treatment by PVD. Pre-stressed reinfroced concrete bridge (75+120+75)m, approach bridge 8 spans x33m/ span, Abutments and piers on bored cast-in-place piles
Hai Phong city
Haiphong Department of Transport