+ Span structure: Prestressed reinforced concrete box girder and super T prestressed reinforced concrete girder (L=38m) according to the span diagram: (2×38+70+110+70+2×38) m; The global length is 410.6m. + Reinforced reinforced concrete abutment on bored pile system D=1÷1.5m. + Lighting system on Tan An bridge.
Long An
Project Management Board 7