Resiliencecreates values

Yen Hoanh Bridge

details

Scale:

Prestressed reinforced concrete girder L=33m, continuous cantilever beam 50m+2x75m+50m, reinforced concrete abutment on bored pile system D=1- 1.5m

Location:

Thanh Hoa

Investor:

Thanh Hoa Department of Transport