Resiliencecreates values

Final sections of central Vietnam’s longest sea-crossing bridge joined

30/04/2025Construction
On the morning of April 30, 2025, in Hue City, the joining ceremony of the Thuan An Bridge—the longest sea-crossing bridge in Central Vietnam—officially took place, marking a significant milestone in the construction of a nationally strategic transportation project.

Thuan An sea -crossing bridge has a total length of nearly 2.4 km, with over 1.3 km stretching across the sea. The main span of the bridge employs an Extradose girder structure—one of today's most advanced technologies—with a navigational clearance of 218 meters wide and 40 meters high, allowing vessels of over 5,000 tons to conveniently access Thuan An Port. This is the highest and longest Extradose span in Vietnam, constructed on a foundation of 34 bored piles with a diameter of 2 meters and a depth of over 83 meters, ensuring superior stability in complex geological conditions. The A-shaped tower stands 32 meters tall, with the total height from water level to the top of the tower reaching 72 meters, creating a striking modern architectural feature for the project.

The bridge is a key component of the coastal road project passing through Hue City. It plays a vital role in connecting the suburban communes of Phu Vang District to the urban center and establishing a regional linkage corridor among the coastal economic zones of Central Vietnam. Upon completion, the project will contribute to promoting economic, social, and tourism development in the Central region and enhance the national transportation network.

HL Thuận An (1)

Successfully joining the main span on the symbolic occasion of April 30 carries a powerful message, clearly demonstrating determination and unity in maintaining progress, ensuring quality, and upholding construction safety.

As the main contractor, Dat Phuong Group maximized its resources, organizing round-the-clock three-shift construction schedules, and applying technically optimized construction solutions suitable for the area’s unique geological, hydrological, and climatic conditions. The close and effective coordination between the contractor, consultants, investor, local authorities, and relevant parties was a key factor in the project's success.

HL Thuận An (2)-1
HL Thuận An (3)

With this milestone event, Dat Phuong once again affirms its position and capability in executing large-scale transportation infrastructure projects, especially river- and sea-crossing works—a field where the company has made its mark with a series of nationally significant projects across the country.

HL Thuận An (4)-1