With a total investment of VND 1,260 billion, this key project is part of the coastal road route from Vung Tau to Binh Thuan, playing a strategic role in the development of infrastructure, economy, and tourism in the Southern coastal region.
The project spans a total length of 9.59 km, including the 721.2-meter-long Cua Lap 2 Bridge, fully constructed by Dat Phuong Group. The bridge has a width of 12.5 meters, consists of 20 beam spans, is designed with three lanes, and supports a maximum speed of 50 km/h.
As the main contractor, Dat Phuong successfully completed the project on schedule within 20 months, meeting all quality and technical standards despite the complex coastal terrain. This achievement once again demonstrates the company’s construction capabilities, quality control proficiency, and effective coordination in the field of transportation infrastructure.
The operation of Cua Lap 2 Bridge not only helps relieve traffic on the old bridge but also enhances connectivity between key economic and tourist centers such as Long Dien, Dat Do, Long Hai, and Thuy Duong. It contributes to the completion of route DT994 and promotes the development of coastal services, industry, and urban areas.
The project marks another milestone that highlights Dat Phuong’s continued commitment to creating sustainable values in transportation infrastructure construction—true to the Group’s enduring spirit of “Determined to create value.”