Photos at the ceremony
The project has a length of 242.4m; bridge width 20.5m; mixed cable girder structure, prestressed reinforced concrete, bridge span diagram 65m+100m+65m; the road leading to the bridge is 493m long, 11.5m wide, including the road surface 10.5m wide and the curb 0.5m wide on each side. In which, section 1 from km0+000 (Cua Dai ward, Hoi An city) to km14+000 (Dien Duong ward, Dien Ban town) includes dredging a 14km-long channel and two bridges across the river, Ong Dien
Overview of Ong Dien bridge
Dat Phuong Group, as the main construction contractor, responsible for the construction of complex items such as balance cantilever, cable-stayed ... has actively coordinated with joint venture units to accelerate progress, overcome the difficulties of the prolonged epidemic and the province's distancing regulations from July 2020 so that the project can go into operation on schedule with the highest quality. As soon as the bridge was completed, it received high appreciation from the government and people for its aesthetic value, promising to become a new symbol of Quang Nam.
Ong Dien Bridge - a new symbol of Quang Nam
The project plays an important role in smooth traffic connection, transporting people and tourists in and out between Da Nang - Hoi An through the coastal tourist route. When the construction of Ong Dien bridge across the Co Co river and the road at both ends of the bridge is invested to upgrade and expand, the area on both sides of the bridge is forecasted to develop very bustling, which is very important in the strategy socio-economic development of Quang Nam province in general and Hoi An city and Dien Ban town in particular.